{"id":45424,"date":"2003-11-07T00:00:00","date_gmt":"2003-11-07T00:00:00","guid":{"rendered":"https:\/\/tyronepa.com\/v3\/?p="},"modified":"2003-11-07T00:00:00","modified_gmt":"2003-11-07T00:00:00","slug":"Tyrone-school-board-discusses-renovation-project","status":"publish","type":"post","link":"https:\/\/tyronepa.com\/?p=45424","title":{"rendered":"Tyrone school board discusses renovation project"},"content":{"rendered":"<p>The Tyrone Area School Board reviewed the latest plans for the Middle School\/High School renovation project at its work session earlier this week. Dwight Knouse of the Large architectural firm presented a schematic design for the project to the board.<br \/>\n\u201cKnouse reviewed the plan justification, Part A of the Plan Con which is necessary,\u201d Superintendent Dr. William N. Miller told The Daily Herald.<br \/>\nThat plan must be submitted to the Department of Education in Harrisburg once it\u2019s approved by The Tyrone Area School District. That matter is expected to be brought before the board at the next regularly scheduled meeting on Tuesday night.<br \/>\nThe plans include a breakdown of the renovations to the existing area which is minimal. The district is now looking at an expansion of the project. According to Dr. Miller, the existing building is 221,845 square feet, the new addition would be 59,000 square feet. The increase will be about 25 percent, bringing the building to around 280,000 square feet. Miller said, \u201cthe board was responsive and a discussion ensued about the project.\u201d<br \/>\nThe expanded facility would include a number of classrooms plus science and computer rooms. The issue of a fitness center was discussed along with the potential doubling of size to accommodate a grant that would be for workout equipment. The  grant would come from the National Fitness Foundation according to Superintendent Miller.<br \/>\nThe regular meeting of the Tyrone Area School Board will be held on Tuesday at 7 P.M.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Tyrone Area School Board reviewed the latest plans for the Middle School\/High School renovation project at its work session earlier this week. Dwight Knouse of the Large architectural firm presented a schematic design for the project to the board. \u201cKnouse reviewed the plan justification, Part A of the Plan Con which is necessary,\u201d Superintendent [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-45424","post","type-post","status-publish","format-standard","hentry","category-local-news-in-the-tyrone-pennsylvania-area"],"_links":{"self":[{"href":"https:\/\/tyronepa.com\/index.php?rest_route=\/wp\/v2\/posts\/45424","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/tyronepa.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/tyronepa.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/tyronepa.com\/index.php?rest_route=\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/tyronepa.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=45424"}],"version-history":[{"count":0,"href":"https:\/\/tyronepa.com\/index.php?rest_route=\/wp\/v2\/posts\/45424\/revisions"}],"wp:attachment":[{"href":"https:\/\/tyronepa.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=45424"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/tyronepa.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=45424"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/tyronepa.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=45424"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}